How to Calculate Concrete in Cubic Yards

The formula, step-by-step examples for common projects, a quick reference table, and tips for ordering the right amount.

To calculate concrete, multiply length × width × thickness (in feet) to get cubic feet, then divide by 27 to get cubic yards. A 10 × 10 ft slab that is 4 inches thick needs about 1.23 cubic yards. The rest of this guide shows how to apply the formula to real projects and how much extra to order.

The Concrete Formula

Concrete is ordered and priced by the cubic yard. One cubic yard is 3 ft × 3 ft × 3 ft, which equals 27 cubic feet. That is why every calculation ends with a division by 27.

Step 1 — Cubic feetVolume (cu ft) = Length (ft) × Width (ft) × (Thickness in inches ÷ 12)Step 2 — Cubic yardsCubic yards = Volume (cu ft) ÷ 27Step 3 — Add extraOrder = Cubic yards × 1.05 to 1.10

Measure in feet, and convert thickness from inches to feet by dividing by 12. Mixing inches and feet is the most common source of wrong totals.

Skip the Math

Enter your dimensions and get cubic yards, bags and cost in seconds.

Use the Concrete Calculator →

Worked Examples

Example 1 — Patio, 12 × 10 ft, 4 inches thick

Calculation
Area12 × 10 = 120 sq ft
Cubic feet120 × (4 ÷ 12) = 40 cu ft
+ 5% extra40 × 1.05 = 42 cu ft
Cubic yards42 ÷ 27 = 1.56 yd³

Order about 1.6 cubic yards.

Most patios sit on a compacted gravel base. The gravel calculator shows how much stone that layer needs.

Example 2 — Driveway section, 20 × 10 ft, 4 inches thick

Calculation
Area20 × 10 = 200 sq ft
Cubic feet200 × (4 ÷ 12) = 66.67 cu ft
+ 5% extra66.67 × 1.05 = 70 cu ft
Cubic yards70 ÷ 27 = 2.59 yd³

Order about 2.6 cubic yards.

Driveways that carry heavy vehicles are often poured thicker, so confirm the thickness with your contractor. To compare against paving, run the same area through the asphalt calculator or the driveway cost calculator.

Example 3 — Round footings, 12 in diameter, 3.5 ft deep, 6 tubes

Round footings use the cylinder formula: volume = π × radius² × height, with the radius in feet.

Calculation — 6 tubes
Radius(12 ÷ 2) ÷ 12 = 0.5 ft
One tubeπ × 0.5² × 3.5 = 2.75 cu ft
Six tubes + 5%2.75 × 6 × 1.05 = 17.32 cu ft
Cubic yards17.32 ÷ 27 = 0.64 yd³

About 39 bags of 60 lb mix (17.32 ÷ 0.45).

What a Cubic Yard of Concrete Looks Like

One cubic yard is a block about the size of a washing machine. When a contractor says "order 3.5 yards," they mean 3.5 cubic yards, not square yards or linear yards.

QuestionAnswer
Coverage at 4 in thickAbout 81 sq ft per cubic yard
Coverage at 6 in thickAbout 54 sq ft per cubic yard
Weight of 1 cubic yardAbout 4,000 lb (about 2 tons)
80 lb bags per cubic yardAbout 45 (0.60 cu ft each)
60 lb bags per cubic yardAbout 60 (0.45 cu ft each)
Truck mixer capacity8 to 12 cubic yards

Bag yields vary a little by brand, so check the label. The truck capacity figure comes from the National Ready Mixed Concrete Association (see Sources).

Concrete Cubic Yards by Area and Thickness

Find your area, then read across to your thickness. Values are net volume before extra.

Area3 in4 in5 in6 in
50 sq ft0.460.620.770.93
100 sq ft0.931.231.541.85
150 sq ft1.391.852.312.78
200 sq ft1.852.473.093.70
300 sq ft2.783.704.635.56
400 sq ft3.704.946.177.41
500 sq ft4.636.177.729.26
750 sq ft6.949.2611.5713.89
1,000 sq ft9.2612.3515.4318.52

How to Calculate Concrete for Common Projects

Driveway

Measure the full length and width, including any apron. For an irregular shape, split it into rectangles and add the results. Thickness depends on the loads the driveway will carry, so confirm it with your contractor. Plan the compacted base too, using the gravel calculator.

Patio and walkway

Patios and walkways for foot traffic are commonly poured about 4 inches thick. A 40 ft long, 4 ft wide walkway at 4 inches is 40 × 4 × (4 ÷ 12) = 53.33 cu ft, which is 1.98 cubic yards, or about 2.1 with 5% extra.

Footings and columns

Spread footings use the rectangle formula. Round footings use the cylinder formula shown above. Footing depth is set by local frost depth and building code, so check your local requirements before you calculate.

Steps

Treat each step as a solid block: width × tread depth × total height of that step. Calculate each step separately, add them together, and add the landing if you are pouring one.

Garage floor

Garage slabs are commonly 4 to 6 inches thick, depending on the vehicles and equipment they carry. A well-compacted base matters as much as thickness, because soft or wet ground under a slab is a common cause of cracking.

Ready-Mix or Bags, and How Much Extra to Order

Ready-mix concrete is sold by the cubic yard. Bags make sense for small jobs, usually under about 1 cubic yard, such as a few footings. For larger pours a truck is faster and avoids hours of mixing. Many suppliers have a minimum order or add a short-load fee for small deliveries, so ask before you book.

The National Ready Mixed Concrete Association advises ordering about 4–10% more than your estimate. Use about 5% for a simple, well-formed slab and closer to 10% for irregular shapes or uneven ground. Suppliers usually deliver in quarter-yard steps, so round up to the next quarter yard.

Why not order short? Running out mid-pour can leave a cold joint, a visible seam where fresh concrete meets concrete that has already started to set. Leftover concrete costs far less than repairing that seam.

Common Mistakes to Avoid

  • Mixing units. Convert thickness from inches to feet before multiplying.
  • Using the planned depth instead of the real one. Measure after excavation and base compaction, because low spots add volume.
  • Forgetting thickened edges. If your slab has deeper edge beams, calculate them as separate sections.
  • Ordering the exact number. Always add extra and round up to the supplier's increment.
  • Confusing cement with concrete. Cement is one ingredient. People often say "cement yards" when they mean cubic yards of concrete, and the formula is the same.

Concrete Calculation — Common Questions

A 10 × 10 ft slab at 4 inches thick is 33.33 cubic feet, or 1.23 cubic yards. With 5% extra, order about 1.3 cubic yards. At 6 inches thick it is 1.85 cubic yards, or about 1.95 with extra.

A 20 × 20 ft pad at 4 inches thick is 133.3 cubic feet, or 4.94 cubic yards. With 5% extra, order about 5.2 cubic yards, which your supplier will round to the next increment.

A 30 × 30 ft slab at 4 inches thick is 300 cubic feet, or 11.11 cubic yards. With 5% extra, order about 11.7 cubic yards. At 6 inches it is 16.67 cubic yards before extra.

An 80 lb bag yields about 0.60 cubic feet, so one cubic yard (27 cubic feet) needs about 45 bags. A 60 lb bag yields about 0.45 cubic feet, so about 60 bags.

Split the area into rectangles, calculate each with length × width × thickness (in feet) ÷ 27, then add the totals. Use about 10% extra, because irregular edges waste more than a clean rectangle.

For rectangular footings use length × width × depth (in feet) ÷ 27. For round footings use π × radius² × depth in feet, multiply by the number of footings, divide by 27 and add extra. You can check your totals with the concrete calculator.

Sources and Further Reading

  • National Ready Mixed Concrete Association, CIP 31 — Ordering Ready Mixed Concrete: concrete is sold by the cubic yard, truck mixers carry 8 to 12 cubic yards, and about 4–10% extra is recommended.
  • Prices, minimum orders and delivery rules vary by supplier. Confirm thickness, mix and quantity with your local ready-mix supplier or contractor before ordering.

These figures are planning estimates. See our Disclaimer.

Ready to Calculate Your Pour?

Get cubic yards, bag counts and cost for your own dimensions.

Calculate Concrete Yards →